نبذة
Firsthand Bitcoin sells bitcoin mining machines and hosts them at its own sites in the UAE, Argentina and Nigeria. You own the hardware outright, the pool pays the bitcoin straight to your wallet, and you pay a monthly invoice for the electricity your machines actually used. We never hold your coins. Every machine is compared on what matters: the cost to mine one bitcoin at your power rate. Hosting runs from 3.9¢/kWh at scale in Nigeria to 6.5¢/kWh in the UAE and Argentina, on hydro-cooled and air-cooled Bitmain, MicroBT, Canaan and Bitdeer hardware. Your dashboard shows every machine live: hashrate, temperatures, uptime and payouts. You can switch pools or payout addresses yourself, and sensitive changes require hardware-key approval. Our site software replaces AnyDesk, BTC Tools and Foreman with one system we run on the ground at each facility.
المزايا
You own the machines, not a hashrate contract Payouts go from the pool directly to your wallet; no custody of your bitcoin Hosting from 3.9¢/kWh at scale in Nigeria; 6.0–6.5¢ in the UAE and 5.8–6.5¢ in Argentina 99.3% uptime at the UAE site over the last 30 days, 98.7% in Argentina Point your machines at any pool you choose Live dashboard: hashrate, temperatures, uptime, payouts and pool changes Billed only for the electricity your machines actually use Turnkey: we source, ship, install and maintain the hardware Hydro-cooled latest-generation miners available
Find Firsthand Bitcoin
Website and social profiles
Other
- Country
- الإمارات العربية المتحدة
- Type
- متجر, استضافة, الأدوات والخدمات
Store listings (2)
2 متوفر · $0.0364/kWh
| الطراز | الربح | ROI | معدل التجزئة | القدرة | الخوارزمية | السعر |
|---|---|---|---|---|---|---|
| $7.25 / يوم | 828 يوم | 473 TH/s | $6,000السعر+$7.25ربح يوميًا$12.21الدخل اليومي0.000206 BTCفي اليوممدة الاسترداد: 828 يوم
| $6,000الذهاب إلى المتجر →الذهاب إلى المتجر → | ||
| $2.57 / يوم | 607 يوم | 279 TH/s | $1,560السعر+$2.57ربح يوميًا$7.20الدخل اليومي0.000122 BTCفي اليوممدة الاسترداد: 607 يوم
| $1,560الذهاب إلى المتجر →الذهاب إلى المتجر → |
مواقع الاستضافة (3)
- الحد الأدنى للطلب
- بدون حد أدنى كبير للطلب
- وقت التشغيل
- 73.6%
التفاصيل
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- السعة
- 10 MW
- الحد الأدنى للطلب
- بدون حد أدنى كبير للطلب
- وقت التشغيل
- 99.3%
التفاصيل
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- الحد الأدنى للطلب
- بدون حد أدنى كبير للطلب
- وقت التشغيل
- 98.7%
التفاصيل
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
التفاصيل
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
التفاصيل
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
التفاصيل
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
آراء العملاء
اكتب تقييمًالا توجد تقييمات بعد. هل اشتريت من Firsthand Bitcoin؟ كن أول من يخبر المشترين الآخرين بتجربته.
تأتي التقييمات من مستخدمي AsicProfit المسجّلين، ويراجعها فريقنا قبل ظهورها. لا نعدّل أبدًا ما تكتبه؛ نحذف فقط الرسائل المزعجة والإهانات والتقييمات المكتوبة من موظفي المتجر نفسه.
أسئلة وأجوبة
أسئلة المشترين إلى Firsthand Bitcoin. يجيب المتجر عنها بنفسه، وتظهر الأسئلة بعد مراجعة فريقنا لها.
لا توجد أسئلة بعد. اطرح أول سؤال.
سجّل الدخول بحساب موثّق لطرح سؤال. تسجيل الدخول


















