Firsthand Bitcoin
За компанията
Firsthand Bitcoin sells bitcoin mining machines and hosts them at its own sites in the UAE, Argentina and Nigeria. You own the hardware outright, the pool pays the bitcoin straight to your wallet, and you pay a monthly invoice for the electricity your machines actually used. We never hold your coins. Every machine is compared on what matters: the cost to mine one bitcoin at your power rate. Hosting runs from 3.9¢/kWh at scale in Nigeria to 6.5¢/kWh in the UAE and Argentina, on hydro-cooled and air-cooled Bitmain, MicroBT, Canaan and Bitdeer hardware. Your dashboard shows every machine live: hashrate, temperatures, uptime and payouts. You can switch pools or payout addresses yourself, and sensitive changes require hardware-key approval. Our site software replaces AnyDesk, BTC Tools and Foreman with one system we run on the ground at each facility.
Предимства
You own the machines, not a hashrate contract Payouts go from the pool directly to your wallet; no custody of your bitcoin Hosting from 3.9¢/kWh at scale in Nigeria; 6.0–6.5¢ in the UAE and 5.8–6.5¢ in Argentina 99.3% uptime at the UAE site over the last 30 days, 98.7% in Argentina Point your machines at any pool you choose Live dashboard: hashrate, temperatures, uptime, payouts and pool changes Billed only for the electricity your machines actually use Turnkey: we source, ship, install and maintain the hardware Hydro-cooled latest-generation miners available
Find Firsthand Bitcoin
Website and social profiles
Other
- Country
- Обединени арабски емирства
- Type
- Магазин, Хостинг, Инструменти и услуги
Store listings (2)
2 в наличност · $0.0364/kWh
| Модел | Печалба | ROI | Хешрейт | Мощност | Алгоритъм | Цена |
|---|---|---|---|---|---|---|
| $7.26 / ден | 827 дни | 473 TH/s | $6,000Цена+$7.26печалба на ден$12.22приход на ден0.000206 BTCна денВъзвръщаемост: 827 дни
| $6,000Към магазина →Към магазина → | ||
| $2.58 / ден | 606 дни | 279 TH/s | $1,560Цена+$2.58печалба на ден$7.21приход на ден0.000122 BTCна денВъзвръщаемост: 606 дни
| $1,560Към магазина →Към магазина → |
Хостинг локации (3)
- Минимална поръчка
- Без голяма минимална поръчка
- Ъптайм
- 73.6%
Подробности
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- Капацитет
- 10 MW
- Минимална поръчка
- Без голяма минимална поръчка
- Ъптайм
- 99.3%
Подробности
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- Минимална поръчка
- Без голяма минимална поръчка
- Ъптайм
- 98.7%
Подробности
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Подробности
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Подробности
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Подробности
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Отзиви от клиенти
Напиши отзивВсе още няма отзиви. Пазарували ли сте от Firsthand Bitcoin? Бъдете първият, който ще разкаже на другите купувачи как е минало.
Отзивите са от влезли в профила си потребители на AsicProfit и се проверяват от нашия екип, преди да се покажат. Никога не редактираме написаното от вас; премахваме само спам, обиди и отзиви от служители на самия магазин.
Въпроси и отговори
Въпроси от купувачи към Firsthand Bitcoin. Магазинът отговаря сам; въпросите се показват след проверка от нашия екип.
Все още няма въпроси. Задайте първия.
Влезте с проверен акаунт, за да зададете въпрос. Вход


















