Firsthand Bitcoin sells bitcoin mining machines and hosts them at its own sites in the UAE, Argentina and Nigeria. You own the hardware outright, the pool pays the bitcoin straight to your wallet, and you pay a monthly invoice for the electricity your machines actually used. We never hold your coins. Every machine is compared on what matters: the cost to mine one bitcoin at your power rate. Hosting runs from 3.9¢/kWh at scale in Nigeria to 6.5¢/kWh in the UAE and Argentina, on hydro-cooled and air-cooled Bitmain, MicroBT, Canaan and Bitdeer hardware. Your dashboard shows every machine live: hashrate, temperatures, uptime and payouts. You can switch pools or payout addresses yourself, and sensitive changes require hardware-key approval. Our site software replaces AnyDesk, BTC Tools and Foreman with one system we run on the ground at each facility.
Výhody
You own the machines, not a hashrate contract Payouts go from the pool directly to your wallet; no custody of your bitcoin Hosting from 3.9¢/kWh at scale in Nigeria; 6.0–6.5¢ in the UAE and 5.8–6.5¢ in Argentina 99.3% uptime at the UAE site over the last 30 days, 98.7% in Argentina Point your machines at any pool you choose Live dashboard: hashrate, temperatures, uptime, payouts and pool changes Billed only for the electricity your machines actually use Turnkey: we source, ship, install and maintain the hardware Hydro-cooled latest-generation miners available
Find Firsthand Bitcoin
Website and social profiles
Other
- Country
- Spojené arabské emiráty
- Type
- Obchod, Hosting, Nástroje a služby
Store listings (2)
2 skladem · $0.0364/kWh
| Model | Zisk | ROI | Hashrate | Příkon | Algoritmus | Cena |
|---|---|---|---|---|---|---|
| $7.29 / den | 824 dní | 473 TH/s | $6,000Cena+$7.29zisk za den$12.25příjem za den0.000206 BTCza denNávratnost: 824 dní
| $6,000Do obchodu →Do obchodu → | ||
| $2.59 / den | 602 dní | 279 TH/s | $1,560Cena+$2.59zisk za den$7.22příjem za den0.000122 BTCza denNávratnost: 602 dní
| $1,560Do obchodu →Do obchodu → |
Lokality hostingu (3)
- Minimální objednávka
- Bez velkého minimálního odběru
- Dostupnost
- 73.6%
Detail
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- Kapacita
- 10 MW
- Minimální objednávka
- Bez velkého minimálního odběru
- Dostupnost
- 99.3%
Detail
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- Minimální objednávka
- Bez velkého minimálního odběru
- Dostupnost
- 98.7%
Detail
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Detail
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Detail
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Detail
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Hodnocení zákazníků
Napsat hodnoceníZatím žádná hodnocení. Nakoupili jste u Firsthand Bitcoin? Buďte první, kdo ostatním těžařům napíše, jak to proběhlo.
Hodnocení píší přihlášení uživatelé AsicProfit a náš tým je před zveřejněním kontroluje. To, co napíšete, nikdy neupravujeme; odstraňujeme jen spam, urážky a hodnocení od lidí z daného obchodu.
Dotazy a odpovědi
Dotazy kupujících na Firsthand Bitcoin. Obchod na ně odpovídá sám; dotazy se zobrazí po kontrole naším týmem.
Zatím žádné dotazy. Zeptejte se jako první.
Pro položení dotazu se přihlaste ověřeným účtem. Přihlásit se