Firsthand Bitcoin
O podjetju
Firsthand Bitcoin sells bitcoin mining machines and hosts them at its own sites in the UAE, Argentina and Nigeria. You own the hardware outright, the pool pays the bitcoin straight to your wallet, and you pay a monthly invoice for the electricity your machines actually used. We never hold your coins. Every machine is compared on what matters: the cost to mine one bitcoin at your power rate. Hosting runs from 3.9¢/kWh at scale in Nigeria to 6.5¢/kWh in the UAE and Argentina, on hydro-cooled and air-cooled Bitmain, MicroBT, Canaan and Bitdeer hardware. Your dashboard shows every machine live: hashrate, temperatures, uptime and payouts. You can switch pools or payout addresses yourself, and sensitive changes require hardware-key approval. Our site software replaces AnyDesk, BTC Tools and Foreman with one system we run on the ground at each facility.
Prednosti
You own the machines, not a hashrate contract Payouts go from the pool directly to your wallet; no custody of your bitcoin Hosting from 3.9¢/kWh at scale in Nigeria; 6.0–6.5¢ in the UAE and 5.8–6.5¢ in Argentina 99.3% uptime at the UAE site over the last 30 days, 98.7% in Argentina Point your machines at any pool you choose Live dashboard: hashrate, temperatures, uptime, payouts and pool changes Billed only for the electricity your machines actually use Turnkey: we source, ship, install and maintain the hardware Hydro-cooled latest-generation miners available
Find Firsthand Bitcoin
Website and social profiles
Other
- Country
- Združeni arabski emirati
- Type
- Trgovina, Gostovanje, Orodja in storitve
Store listings (2)
2 na zalogi · $0.0364/kWh
| Model | Dobiček | ROI | Hashrate | Moč | Algoritem | Cena |
|---|---|---|---|---|---|---|
| $7.28 / dan | 825 dni | 473 TH/s | $6,000Cena+$7.28dobička na dan$12.23prihodek na dan0.000206 BTCna danPovračilo: 825 dni
| $6,000V trgovino →V trgovino → | ||
| $2.59 / dan | 604 dni | 279 TH/s | $1,560Cena+$2.59dobička na dan$7.22prihodek na dan0.000122 BTCna danPovračilo: 604 dni
| $1,560V trgovino →V trgovino → |
Lokacije gostovanja (3)
- Najmanjše naročilo
- Brez velikega najmanjšega naročila
- Razpoložljivost
- 73.6%
Podrobnosti
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- Zmogljivost
- 10 MW
- Najmanjše naročilo
- Brez velikega najmanjšega naročila
- Razpoložljivost
- 99.3%
Podrobnosti
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- Najmanjše naročilo
- Brez velikega najmanjšega naročila
- Razpoložljivost
- 98.7%
Podrobnosti
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Podrobnosti
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Podrobnosti
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Podrobnosti
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Mnenja strank
Napišite mnenjeMnenj še ni. Ste kupili pri Firsthand Bitcoin? Bodite prvi, ki bo drugim kupcem povedal, kako je bilo.
Mnenja pišejo prijavljeni uporabniki AsicProfit, naša ekipa pa jih pred objavo preveri. Nikoli ne urejamo tega, kar napišete; odstranimo le neželeno pošto, žalitve in mnenja zaposlenih v trgovini.
Vprašanja in odgovori
Vprašanja kupcev za Firsthand Bitcoin. Trgovina nanje odgovarja sama; vprašanja se prikažejo po pregledu naše ekipe.
Še ni vprašanj. Zastavite prvo.
Prijavite se s preverjenim računom, da zastavite vprašanje. Prijava

















