Firsthand Bitcoin
Rólunk
Firsthand Bitcoin sells bitcoin mining machines and hosts them at its own sites in the UAE, Argentina and Nigeria. You own the hardware outright, the pool pays the bitcoin straight to your wallet, and you pay a monthly invoice for the electricity your machines actually used. We never hold your coins. Every machine is compared on what matters: the cost to mine one bitcoin at your power rate. Hosting runs from 3.9¢/kWh at scale in Nigeria to 6.5¢/kWh in the UAE and Argentina, on hydro-cooled and air-cooled Bitmain, MicroBT, Canaan and Bitdeer hardware. Your dashboard shows every machine live: hashrate, temperatures, uptime and payouts. You can switch pools or payout addresses yourself, and sensitive changes require hardware-key approval. Our site software replaces AnyDesk, BTC Tools and Foreman with one system we run on the ground at each facility.
Előnyök
You own the machines, not a hashrate contract Payouts go from the pool directly to your wallet; no custody of your bitcoin Hosting from 3.9¢/kWh at scale in Nigeria; 6.0–6.5¢ in the UAE and 5.8–6.5¢ in Argentina 99.3% uptime at the UAE site over the last 30 days, 98.7% in Argentina Point your machines at any pool you choose Live dashboard: hashrate, temperatures, uptime, payouts and pool changes Billed only for the electricity your machines actually use Turnkey: we source, ship, install and maintain the hardware Hydro-cooled latest-generation miners available
Find Firsthand Bitcoin
Website and social profiles
Other
- Country
- Egyesült Arab Emírségek
- Type
- Bolt, Hosting, Eszközök és szolgáltatások
Store listings (2)
2 raktáron · $0.0364/kWh
| Modell | Nyereség | ROI | Hashrate | Teljesítmény | Algoritmus | Ár |
|---|---|---|---|---|---|---|
| $7.29 / nap | 824 nap | 473 TH/s | $6,000Ár+$7.29nyereség naponta$12.25napi bevétel0.000206 BTCnapontaMegtérülés: 824 nap
| $6,000Tovább a boltba →Tovább a boltba → | ||
| $2.59 / nap | 602 nap | 279 TH/s | $1,560Ár+$2.59nyereség naponta$7.22napi bevétel0.000122 BTCnapontaMegtérülés: 602 nap
| $1,560Tovább a boltba →Tovább a boltba → |
Hosting-helyszínek (3)
- Minimális rendelés
- Nincs nagy minimális rendelés
- Rendelkezésre állás
- 73.6%
Részletek
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- Kapacitás
- 10 MW
- Minimális rendelés
- Nincs nagy minimális rendelés
- Rendelkezésre állás
- 99.3%
Részletek
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- Minimális rendelés
- Nincs nagy minimális rendelés
- Rendelkezésre állás
- 98.7%
Részletek
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Részletek
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Részletek
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Részletek
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Vásárlói értékelések
Értékelés írásaMég nincs értékelés. Vásárolt már itt: Firsthand Bitcoin? Ossza meg elsőként más vásárlókkal, hogyan sikerült.
Az értékeléseket bejelentkezett AsicProfit-felhasználók írják, és csapatunk megjelenés előtt ellenőrzi őket. Soha nem módosítjuk, amit ír; csak a spamet, a sértéseket és a bolt saját embereitől származó értékeléseket távolítjuk el.
Kérdések és válaszok
Vásárlók kérdései a(z) Firsthand Bitcoin számára. Az üzlet maga válaszol; a kérdések csapatunk ellenőrzése után jelennek meg.
Még nincs kérdés. Tegye fel az elsőt.
Kérdés feltevéséhez jelentkezzen be ellenőrzött fiókkal. Bejelentkezés


















