Firsthand Bitcoin
O spoločnosti
Firsthand Bitcoin sells bitcoin mining machines and hosts them at its own sites in the UAE, Argentina and Nigeria. You own the hardware outright, the pool pays the bitcoin straight to your wallet, and you pay a monthly invoice for the electricity your machines actually used. We never hold your coins. Every machine is compared on what matters: the cost to mine one bitcoin at your power rate. Hosting runs from 3.9¢/kWh at scale in Nigeria to 6.5¢/kWh in the UAE and Argentina, on hydro-cooled and air-cooled Bitmain, MicroBT, Canaan and Bitdeer hardware. Your dashboard shows every machine live: hashrate, temperatures, uptime and payouts. You can switch pools or payout addresses yourself, and sensitive changes require hardware-key approval. Our site software replaces AnyDesk, BTC Tools and Foreman with one system we run on the ground at each facility.
Výhody
You own the machines, not a hashrate contract Payouts go from the pool directly to your wallet; no custody of your bitcoin Hosting from 3.9¢/kWh at scale in Nigeria; 6.0–6.5¢ in the UAE and 5.8–6.5¢ in Argentina 99.3% uptime at the UAE site over the last 30 days, 98.7% in Argentina Point your machines at any pool you choose Live dashboard: hashrate, temperatures, uptime, payouts and pool changes Billed only for the electricity your machines actually use Turnkey: we source, ship, install and maintain the hardware Hydro-cooled latest-generation miners available
Find Firsthand Bitcoin
Website and social profiles
Other
- Country
- Spojené arabské emiráty
- Type
- Obchod, Hosting, Nástroje a služby
Store listings (2)
2 skladom · $0.0364/kWh
| Model | Zisk | ROI | Hashrate | Príkon | Algoritmus | Cena |
|---|---|---|---|---|---|---|
| $7.28 / deň | 825 dní | 473 TH/s | $6,000Cena+$7.28zisk za deň$12.23príjem za deň0.000206 BTCza deňNávratnosť: 825 dní
| $6,000Do obchodu →Do obchodu → | ||
| $2.59 / deň | 604 dní | 279 TH/s | $1,560Cena+$2.59zisk za deň$7.22príjem za deň0.000122 BTCza deňNávratnosť: 604 dní
| $1,560Do obchodu →Do obchodu → |
Lokality hostingu (3)
- Minimálna objednávka
- Bez veľkého minimálneho odberu
- Dostupnosť
- 73.6%
Podrobnosti
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- Kapacita
- 10 MW
- Minimálna objednávka
- Bez veľkého minimálneho odberu
- Dostupnosť
- 99.3%
Podrobnosti
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- Minimálna objednávka
- Bez veľkého minimálneho odberu
- Dostupnosť
- 98.7%
Podrobnosti
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Podrobnosti
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Podrobnosti
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Podrobnosti
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Hodnotenia zákazníkov
Napísať hodnotenieZatiaľ žiadne hodnotenia. Nakúpili ste u Firsthand Bitcoin? Buďte prvý, kto ostatným ťažiarom napíše, ako to prebehlo.
Hodnotenia píšu prihlásení používatelia AsicProfit a náš tím ich pred zverejnením kontroluje. To, čo napíšete, nikdy neupravujeme; odstraňujeme len spam, urážky a hodnotenia od ľudí z daného obchodu.
Otázky a odpovede
Otázky kupujúcich pre Firsthand Bitcoin. Obchod na ne odpovedá sám; otázky sa zobrazia po kontrole naším tímom.
Zatiaľ žiadne otázky. Opýtajte sa ako prvý.
Na položenie otázky sa prihláste overeným účtom. Prihlásiť sa

















