The Mining Future
Egyesült Arab Emírségek · Alapítva: 2021
Rólunk
The Mining Future sells ASIC miners from Bitmain, MicroBT, Canaan and IceRiver and runs hosting in Abu Dhabi (UAE), Kuwait and Calpulalpan (Mexico). Buyers can have a miner installed at one of its hosting sites or delivered to their own address. Prices are in US dollars (euros can be selected), and payment is accepted in USD, EUR or crypto. The company was founded in 2021 and started its own mining in Georgia before expanding to the Middle East and Latin America.
Előnyök
Hosting in the UAE, Kuwait and Mexico from one miner up Miners delivered to your address or installed at its sites Payment in USD, EUR or crypto Optional co-management of hosted miners
Eladó bányászgépek (10)
10 raktáron · $0.0364/kWh
| Modell | Nyereség | Ár | ROI | Elérhetőség | |
|---|---|---|---|---|---|
| Bitmain Antminer Z15 Pro | $47.94 / nap | $8,199 | 172 nap | Előrendelés | $8,199Ajánlat megtekintése → |
| Canaan Avalon A16XP-300T | $7.47 / nap | $5,399 | 723 nap | Előrendelés | $5,399Ajánlat megtekintése → |
| Bitmain Antminer S21 XP Immersion (300Th) | $7.30 / nap | $2,975 | 408 nap | Raktáron | $2,975Ajánlat megtekintése → |
| Canaan Avalon A16-282T | $6.78 / nap | $4,275 | 631 nap | Előrendelés | $4,275Ajánlat megtekintése → |
| Bitmain Antminer L9 (16Gh) | $6.55 / nap | $3,249 | 496 nap | Raktáron | $3,249Ajánlat megtekintése → |
| Bitmain Antminer S21 Pro (234Th) | $5.38 / nap | $2,399 | 446 nap | Raktáron | $2,399Ajánlat megtekintése → |
| Canaan Avalon A15Pro-221T | $4.78 / nap | $1,975 | 413 nap | Raktáron | $1,975Ajánlat megtekintése → |
| Bitmain Antminer KS7 (45Th) | $4.44 / nap | $2,225 | 502 nap | Előrendelés | $2,225Ajánlat megtekintése → |
| IceRiver ALEO AE3 | $3.37 / nap | $5,749 | 1707 nap | Előrendelés | $5,749Ajánlat megtekintése → |
| Canaan Avalon Q | $1.79 / nap | $2,025 | 1133 nap | Raktáron | $2,025Ajánlat megtekintése → |
Hosting-helyszínek (3)
3 MW hosting in Calpulalpan for air-cooled ASIC miners. Electricity USD 0.058/kWh (down to USD 0.055 for bulk orders), optional co-management +USD 0.002/kWh, 2-month deposit and 12-month contract.
Ajánlat megtekintése →2.5 MW hosting in Kuwait for air and hydro-cooled ASICs. Electricity USD 0.060/kWh air-cooled and USD 0.070/kWh hydro-cooled, optional co-management +USD 0.002/kWh, 2-month deposit and 12-month contract.
Ajánlat megtekintése →Hosting at several sites in the emirate of Abu Dhabi with 5 MW in total, for air, immersion and hydro-cooled ASICs. Electricity from USD 0.067-0.073/kWh, optional co-management +USD 0.002/kWh, 2-month deposit and 12-month contract.
Ajánlat megtekintése →Vásárlói értékelések
Értékelés írásaMég nincs értékelés. Vásárolt már itt: The Mining Future? Ossza meg elsőként más vásárlókkal, hogyan sikerült.
Az értékeléseket bejelentkezett AsicProfit-felhasználók írják, és csapatunk megjelenés előtt ellenőrzi őket. Soha nem módosítjuk, amit ír; csak a spamet, a sértéseket és a bolt saját embereitől származó értékeléseket távolítjuk el.