Firsthand Bitcoin
Par uzņēmumu
Firsthand Bitcoin sells bitcoin mining machines and hosts them at its own sites in the UAE, Argentina and Nigeria. You own the hardware outright, the pool pays the bitcoin straight to your wallet, and you pay a monthly invoice for the electricity your machines actually used. We never hold your coins. Every machine is compared on what matters: the cost to mine one bitcoin at your power rate. Hosting runs from 3.9¢/kWh at scale in Nigeria to 6.5¢/kWh in the UAE and Argentina, on hydro-cooled and air-cooled Bitmain, MicroBT, Canaan and Bitdeer hardware. Your dashboard shows every machine live: hashrate, temperatures, uptime and payouts. You can switch pools or payout addresses yourself, and sensitive changes require hardware-key approval. Our site software replaces AnyDesk, BTC Tools and Foreman with one system we run on the ground at each facility.
Priekšrocības
You own the machines, not a hashrate contract Payouts go from the pool directly to your wallet; no custody of your bitcoin Hosting from 3.9¢/kWh at scale in Nigeria; 6.0–6.5¢ in the UAE and 5.8–6.5¢ in Argentina 99.3% uptime at the UAE site over the last 30 days, 98.7% in Argentina Point your machines at any pool you choose Live dashboard: hashrate, temperatures, uptime, payouts and pool changes Billed only for the electricity your machines actually use Turnkey: we source, ship, install and maintain the hardware Hydro-cooled latest-generation miners available
Find Firsthand Bitcoin
Website and social profiles
Other
- Country
- Apvienotie Arābu Emirāti
- Type
- Veikals, Hostings, Rīki un pakalpojumi
Store listings (2)
2 noliktavā · $0.0364/kWh
| Modelis | Peļņa | ROI | Hashrate | Jauda | Algoritms | Cena |
|---|---|---|---|---|---|---|
| $7.25 / dienā | 828 dienas | 473 TH/s | $6,000Cena+$7.25peļņa dienā$12.21ienākumi dienā0.000206 BTCdienāAtmaksāšanās: 828 dienas
| $6,000Uz veikalu →Uz veikalu → | ||
| $2.57 / dienā | 607 dienas | 279 TH/s | $1,560Cena+$2.57peļņa dienā$7.20ienākumi dienā0.000122 BTCdienāAtmaksāšanās: 607 dienas
| $1,560Uz veikalu →Uz veikalu → |
Hostinga atrašanās vietas (3)
- Minimālais pasūtījums
- Bez liela minimālā pasūtījuma
- Darbspēja
- 73.6%
Sīkāk
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- Jauda
- 10 MW
- Minimālais pasūtījums
- Bez liela minimālā pasūtījuma
- Darbspēja
- 99.3%
Sīkāk
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- Minimālais pasūtījums
- Bez liela minimālā pasūtījuma
- Darbspēja
- 98.7%
Sīkāk
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Sīkāk
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Sīkāk
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Sīkāk
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Klientu atsauksmes
Rakstīt atsauksmiAtsauksmju vēl nav. Pirkāt no Firsthand Bitcoin? Esiet pirmie, kas pastāsta citiem pircējiem, kā gāja.
Atsauksmes raksta pieteikušies AsicProfit lietotāji, un mūsu komanda tās pārbauda pirms publicēšanas. Mēs nekad nelabojam to, ko rakstāt; dzēšam tikai surogātpastu, apvainojumus un paša veikala cilvēku atsauksmes.
Jautājumi un atbildes
Pircēju jautājumi veikalam Firsthand Bitcoin. Veikals uz tiem atbild pats; jautājumi parādās pēc mūsu komandas pārbaudes.
Jautājumu vēl nav. Uzdodiet pirmo.
Piesakieties ar pārbaudītu kontu, lai uzdotu jautājumu. Pieteikties


















