The Mining Future
الإمارات العربية المتحدة · تأسست عام 2021
نبذة
The Mining Future sells ASIC miners from Bitmain, MicroBT, Canaan and IceRiver and runs hosting in Abu Dhabi (UAE), Kuwait and Calpulalpan (Mexico). Buyers can have a miner installed at one of its hosting sites or delivered to their own address. Prices are in US dollars (euros can be selected), and payment is accepted in USD, EUR or crypto. The company was founded in 2021 and started its own mining in Georgia before expanding to the Middle East and Latin America.
المزايا
Hosting in the UAE, Kuwait and Mexico from one miner up Miners delivered to your address or installed at its sites Payment in USD, EUR or crypto Optional co-management of hosted miners
معدّنات للبيع (10)
10 متوفر · $0.0364/kWh
| الطراز | الربح | السعر | ROI | التوفر | |
|---|---|---|---|---|---|
| Bitmain Antminer Z15 Pro | $47.94 / يوم | $8,199 | 172 يوم | طلب مسبق | $8,199عرض التفاصيل → |
| Canaan Avalon A16XP-300T | $7.47 / يوم | $5,399 | 723 يوم | طلب مسبق | $5,399عرض التفاصيل → |
| Bitmain Antminer S21 XP Immersion (300Th) | $7.30 / يوم | $2,975 | 408 يوم | متوفر | $2,975عرض التفاصيل → |
| Canaan Avalon A16-282T | $6.78 / يوم | $4,275 | 631 يوم | طلب مسبق | $4,275عرض التفاصيل → |
| Bitmain Antminer L9 (16Gh) | $6.55 / يوم | $3,249 | 496 يوم | متوفر | $3,249عرض التفاصيل → |
| Bitmain Antminer S21 Pro (234Th) | $5.38 / يوم | $2,399 | 446 يوم | متوفر | $2,399عرض التفاصيل → |
| Canaan Avalon A15Pro-221T | $4.78 / يوم | $1,975 | 413 يوم | متوفر | $1,975عرض التفاصيل → |
| Bitmain Antminer KS7 (45Th) | $4.44 / يوم | $2,225 | 502 يوم | طلب مسبق | $2,225عرض التفاصيل → |
| IceRiver ALEO AE3 | $3.37 / يوم | $5,749 | 1707 يوم | طلب مسبق | $5,749عرض التفاصيل → |
| Canaan Avalon Q | $1.79 / يوم | $2,025 | 1133 يوم | متوفر | $2,025عرض التفاصيل → |
مواقع الاستضافة (3)
3 MW hosting in Calpulalpan for air-cooled ASIC miners. Electricity USD 0.058/kWh (down to USD 0.055 for bulk orders), optional co-management +USD 0.002/kWh, 2-month deposit and 12-month contract.
عرض التفاصيل →2.5 MW hosting in Kuwait for air and hydro-cooled ASICs. Electricity USD 0.060/kWh air-cooled and USD 0.070/kWh hydro-cooled, optional co-management +USD 0.002/kWh, 2-month deposit and 12-month contract.
عرض التفاصيل →Hosting at several sites in the emirate of Abu Dhabi with 5 MW in total, for air, immersion and hydro-cooled ASICs. Electricity from USD 0.067-0.073/kWh, optional co-management +USD 0.002/kWh, 2-month deposit and 12-month contract.
عرض التفاصيل →آراء العملاء
اكتب تقييمًالا توجد تقييمات بعد. هل اشتريت من The Mining Future؟ كن أول من يخبر المشترين الآخرين بتجربته.
تأتي التقييمات من مستخدمي AsicProfit المسجّلين، ويراجعها فريقنا قبل ظهورها. لا نعدّل أبدًا ما تكتبه؛ نحذف فقط الرسائل المزعجة والإهانات والتقييمات المكتوبة من موظفي المتجر نفسه.