The Mining Future
Emiratele Arabe Unite · Fondat în 2021
Despre
The Mining Future sells ASIC miners from Bitmain, MicroBT, Canaan and IceRiver and runs hosting in Abu Dhabi (UAE), Kuwait and Calpulalpan (Mexico). Buyers can have a miner installed at one of its hosting sites or delivered to their own address. Prices are in US dollars (euros can be selected), and payment is accepted in USD, EUR or crypto. The company was founded in 2021 and started its own mining in Georgia before expanding to the Middle East and Latin America.
Avantaje
Hosting in the UAE, Kuwait and Mexico from one miner up Miners delivered to your address or installed at its sites Payment in USD, EUR or crypto Optional co-management of hosted miners
Minere de vânzare (10)
10 în stoc · $0.0364/kWh
| Model | Profit | Preț | ROI | Disponibilitate | |
|---|---|---|---|---|---|
| Bitmain Antminer Z15 Pro | $47.94 / zi | $8,199 | 172 zile | Precomandă | $8,199Vedeți oferta → |
| Canaan Avalon A16XP-300T | $7.47 / zi | $5,399 | 723 zile | Precomandă | $5,399Vedeți oferta → |
| Bitmain Antminer S21 XP Immersion (300Th) | $7.30 / zi | $2,975 | 408 zile | În stoc | $2,975Vedeți oferta → |
| Canaan Avalon A16-282T | $6.78 / zi | $4,275 | 631 zile | Precomandă | $4,275Vedeți oferta → |
| Bitmain Antminer L9 (16Gh) | $6.55 / zi | $3,249 | 496 zile | În stoc | $3,249Vedeți oferta → |
| Bitmain Antminer S21 Pro (234Th) | $5.38 / zi | $2,399 | 446 zile | În stoc | $2,399Vedeți oferta → |
| Canaan Avalon A15Pro-221T | $4.78 / zi | $1,975 | 413 zile | În stoc | $1,975Vedeți oferta → |
| Bitmain Antminer KS7 (45Th) | $4.44 / zi | $2,225 | 502 zile | Precomandă | $2,225Vedeți oferta → |
| IceRiver ALEO AE3 | $3.37 / zi | $5,749 | 1707 zile | Precomandă | $5,749Vedeți oferta → |
| Canaan Avalon Q | $1.79 / zi | $2,025 | 1133 zile | În stoc | $2,025Vedeți oferta → |
Locații de găzduire (3)
3 MW hosting in Calpulalpan for air-cooled ASIC miners. Electricity USD 0.058/kWh (down to USD 0.055 for bulk orders), optional co-management +USD 0.002/kWh, 2-month deposit and 12-month contract.
Vedeți oferta →2.5 MW hosting in Kuwait for air and hydro-cooled ASICs. Electricity USD 0.060/kWh air-cooled and USD 0.070/kWh hydro-cooled, optional co-management +USD 0.002/kWh, 2-month deposit and 12-month contract.
Vedeți oferta →Hosting at several sites in the emirate of Abu Dhabi with 5 MW in total, for air, immersion and hydro-cooled ASICs. Electricity from USD 0.067-0.073/kWh, optional co-management +USD 0.002/kWh, 2-month deposit and 12-month contract.
Vedeți oferta →Recenzii clienți
Scrieți o recenzieÎncă nu există recenzii. Ați cumpărat de la The Mining Future? Fiți primul care le spune altor cumpărători cum a fost.
Recenziile provin de la utilizatori AsicProfit autentificați și sunt verificate de echipa noastră înainte de a apărea. Nu modificăm niciodată ce scrieți; eliminăm doar spamul, insultele și recenziile scrise de oamenii magazinului.