Firsthand Bitcoin
Hakkında
Firsthand Bitcoin sells bitcoin mining machines and hosts them at its own sites in the UAE, Argentina and Nigeria. You own the hardware outright, the pool pays the bitcoin straight to your wallet, and you pay a monthly invoice for the electricity your machines actually used. We never hold your coins. Every machine is compared on what matters: the cost to mine one bitcoin at your power rate. Hosting runs from 3.9¢/kWh at scale in Nigeria to 6.5¢/kWh in the UAE and Argentina, on hydro-cooled and air-cooled Bitmain, MicroBT, Canaan and Bitdeer hardware. Your dashboard shows every machine live: hashrate, temperatures, uptime and payouts. You can switch pools or payout addresses yourself, and sensitive changes require hardware-key approval. Our site software replaces AnyDesk, BTC Tools and Foreman with one system we run on the ground at each facility.
Avantajlar
You own the machines, not a hashrate contract Payouts go from the pool directly to your wallet; no custody of your bitcoin Hosting from 3.9¢/kWh at scale in Nigeria; 6.0–6.5¢ in the UAE and 5.8–6.5¢ in Argentina 99.3% uptime at the UAE site over the last 30 days, 98.7% in Argentina Point your machines at any pool you choose Live dashboard: hashrate, temperatures, uptime, payouts and pool changes Billed only for the electricity your machines actually use Turnkey: we source, ship, install and maintain the hardware Hydro-cooled latest-generation miners available
Find Firsthand Bitcoin
Website and social profiles
Other
- Country
- Birleşik Arap Emirlikleri
- Type
- Mağaza, Hosting, Araçlar ve hizmetler
Store listings (2)
2 stokta · $0.0364/kWh
| Model | Kâr | ROI | Hashrate | Güç | Algoritma | Fiyat |
|---|---|---|---|---|---|---|
| $7.25 / gün | 828 gün | 473 TH/s | $6,000Fiyat+$7.25günlük kâr$12.21günlük gelir0.000206 BTCgündeGeri ödeme: 828 gün
| $6,000Mağazaya git →Mağazaya git → | ||
| $2.57 / gün | 608 gün | 279 TH/s | $1,560Fiyat+$2.57günlük kâr$7.20günlük gelir0.000122 BTCgündeGeri ödeme: 608 gün
| $1,560Mağazaya git →Mağazaya git → |
Barındırma konumları (3)
- Minimum sipariş
- Yüksek minimum sipariş yok
- Çalışma süresi
- 73.6%
Ayrıntılar
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- Kapasite
- 10 MW
- Minimum sipariş
- Yüksek minimum sipariş yok
- Çalışma süresi
- 99.3%
Ayrıntılar
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
- Minimum sipariş
- Yüksek minimum sipariş yok
- Çalışma süresi
- 98.7%
Ayrıntılar
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Ayrıntılar
Flare gas power in Port Harcourt, Niger Delta. 4.5 cents/kWh to start, falling to 3.9 cents as you add machines at this site. Uptime is 73.6% over the last 30 days, so every machine needs a backup power supply. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Ayrıntılar
Grid power on an industrial connection in the desert near Al Ain. 6.5 cents/kWh to start, falling to 6.0 cents as you add machines at this site. 99.3% uptime over the last 30 days. Hydro and immersion cooling, no import duty. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Ayrıntılar
Industrial grid power in Pilar, north of Buenos Aires. 6.5 cents/kWh to start, falling to 5.8 cents as you add machines at this site. 98.7% uptime over the last 30 days. Air and hydro cooling; import duty applies. You own the machine, the pool pays your wallet directly, and you pay only for the electricity used.
Müşteri yorumları
Yorum yazHenüz yorum yok. Firsthand Bitcoin üzerinden satın aldınız mı? Nasıl geçtiğini diğer madencilere ilk siz anlatın.
Yorumlar, giriş yapmış AsicProfit kullanıcılarından gelir ve yayınlanmadan önce ekibimiz tarafından kontrol edilir. Yazdıklarınızı asla düzenlemeyiz; yalnızca spam, hakaret ve mağazanın kendi çalışanlarının yazdığı yorumları kaldırırız.
Sorular ve cevaplar
Alıcıların Firsthand Bitcoin mağazasına soruları. Mağaza bunları kendisi yanıtlar; sorular ekibimiz kontrol ettikten sonra görünür.
Henüz soru yok. İlk soruyu siz sorun.
Soru sormak için doğrulanmış bir hesapla giriş yapın. Giriş yap