The Mining Future
Spojené arabské emiráty · Založené 2021
O spoločnosti
The Mining Future sells ASIC miners from Bitmain, MicroBT, Canaan and IceRiver and runs hosting in Abu Dhabi (UAE), Kuwait and Calpulalpan (Mexico). Buyers can have a miner installed at one of its hosting sites or delivered to their own address. Prices are in US dollars (euros can be selected), and payment is accepted in USD, EUR or crypto. The company was founded in 2021 and started its own mining in Georgia before expanding to the Middle East and Latin America.
Výhody
Hosting in the UAE, Kuwait and Mexico from one miner up Miners delivered to your address or installed at its sites Payment in USD, EUR or crypto Optional co-management of hosted miners
Ťažobné stroje na predaj (10)
10 skladom · $0.0364/kWh
| Model | Zisk | Cena | ROI | Dostupnosť | |
|---|---|---|---|---|---|
| Bitmain Antminer Z15 Pro | $47.94 / deň | $8,199 | 172 dní | Predobjednávka | $8,199Zobraziť ponuku → |
| Canaan Avalon A16XP-300T | $7.47 / deň | $5,399 | 723 dní | Predobjednávka | $5,399Zobraziť ponuku → |
| Bitmain Antminer S21 XP Immersion (300Th) | $7.30 / deň | $2,975 | 408 dní | Na sklade | $2,975Zobraziť ponuku → |
| Canaan Avalon A16-282T | $6.78 / deň | $4,275 | 631 dní | Predobjednávka | $4,275Zobraziť ponuku → |
| Bitmain Antminer L9 (16Gh) | $6.55 / deň | $3,249 | 496 dní | Na sklade | $3,249Zobraziť ponuku → |
| Bitmain Antminer S21 Pro (234Th) | $5.38 / deň | $2,399 | 446 dní | Na sklade | $2,399Zobraziť ponuku → |
| Canaan Avalon A15Pro-221T | $4.78 / deň | $1,975 | 413 dní | Na sklade | $1,975Zobraziť ponuku → |
| Bitmain Antminer KS7 (45Th) | $4.44 / deň | $2,225 | 502 dní | Predobjednávka | $2,225Zobraziť ponuku → |
| IceRiver ALEO AE3 | $3.37 / deň | $5,749 | 1707 dní | Predobjednávka | $5,749Zobraziť ponuku → |
| Canaan Avalon Q | $1.79 / deň | $2,025 | 1133 dní | Na sklade | $2,025Zobraziť ponuku → |
Lokality hostingu (3)
3 MW hosting in Calpulalpan for air-cooled ASIC miners. Electricity USD 0.058/kWh (down to USD 0.055 for bulk orders), optional co-management +USD 0.002/kWh, 2-month deposit and 12-month contract.
Zobraziť ponuku →2.5 MW hosting in Kuwait for air and hydro-cooled ASICs. Electricity USD 0.060/kWh air-cooled and USD 0.070/kWh hydro-cooled, optional co-management +USD 0.002/kWh, 2-month deposit and 12-month contract.
Zobraziť ponuku →Hosting at several sites in the emirate of Abu Dhabi with 5 MW in total, for air, immersion and hydro-cooled ASICs. Electricity from USD 0.067-0.073/kWh, optional co-management +USD 0.002/kWh, 2-month deposit and 12-month contract.
Zobraziť ponuku →Hodnotenia zákazníkov
Napísať hodnotenieZatiaľ žiadne hodnotenia. Nakúpili ste u The Mining Future? Buďte prvý, kto ostatným ťažiarom napíše, ako to prebehlo.
Hodnotenia píšu prihlásení používatelia AsicProfit a náš tím ich pred zverejnením kontroluje. To, čo napíšete, nikdy neupravujeme; odstraňujeme len spam, urážky a hodnotenia od ľudí z daného obchodu.